*Arrange
with the Owner for adequate insurance for the project.
-
*Advise
the Owner with respect to statutory requirements as applicable.
-
*Make
recommendations to the Owner with respect to bonding of Trade Contractors.
-
*Ensure
that all approvals, permits and licenses required for the construction
of the work are obtained.
-
Institute and administer a program of Accident Prevention.
-
*Pre-order
critical materials where necessitated by time factors.
-
*Plan
in detail the nature and extent of all necessary construction facilities
and services for the project and arrange suitable methods for procurement
of same.
-
Arrange for a correct survey and layout of the structure and ensure
that the construction lines and levels are maintained.
-
*Pre-qualify
contractors for each Trade and prepare list of recommended bidders.
-
*Prepare
all documents for the purpose of calling tenders for various Trade
Contracts.
-
*Receive
and analyze tenders and make recommendations for the Trade Contract
awards.
-
*Prepare
the contract documents for all successful Trade Contractors and ensure
that all applicable legal requirements are complied with. Ensure that
all bonds are provided where required and inspect all insurance policies
and workmen's compensation certificates.
-
13. Provide planning, scheduling, expediting, technical coordination,
and supervision, necessary for the proper execution of the work of
all Trades. Perform any work with his own forces where circumstances
demand.
-
*Provide
technical and financial administration with respect to progress payments,
updating cash flow requirements and holdback releases.
-
*Expedite
the receipt of all shop drawings to ensure that they comply with the
specified requirements in general terms before submitting them to
the Architect for approval.
-
*Evaluate
and process all changes. Examine charges by the Trade Contractors
to ensure that they are reasonable and in accordance with the contract
documents.
-
*Provide
for and administer the necessary procedures to permit recovery of
all tax rebates where applicable.
-
Provide advice and assistance on labour problems in order to minimize
work stoppages and in the settlement or jurisdictional or other labour
disputes.
-
Take the necessary action to facilitate the settlement of contract
disputes, it being understood and agreed that no formal arbitration
or litigation proceedings are to be undertaken without the permission
of the Owner.
-
*Ensure
that "as built" drawings, maintenance manuals, operating
instructions, etc., are properly completed and handed over to the
Owner.
-
Ensure that all Trade Contractors employed on the project rectify
all deficiencies.