CONSTRUCTION MANAGEMENT
 

DUTIES OF THE CONSTRUCTION MANAGER



PART II - Construction Phase
  1. *Arrange with the Owner for adequate insurance for the project.

  2. *Advise the Owner with respect to statutory requirements as applicable.

  3. *Make recommendations to the Owner with respect to bonding of Trade Contractors.

  4. *Ensure that all approvals, permits and licenses required for the construction of the work are obtained.

  5. Institute and administer a program of Accident Prevention.

  6. *Pre-order critical materials where necessitated by time factors.

  7. *Plan in detail the nature and extent of all necessary construction facilities and services for the project and arrange suitable methods for procurement of same.

  8. Arrange for a correct survey and layout of the structure and ensure that the construction lines and levels are maintained.

  9. *Pre-qualify contractors for each Trade and prepare list of recommended bidders.

  10. *Prepare all documents for the purpose of calling tenders for various Trade Contracts.

  11. *Receive and analyze tenders and make recommendations for the Trade Contract awards.

  12. *Prepare the contract documents for all successful Trade Contractors and ensure that all applicable legal requirements are complied with. Ensure that all bonds are provided where required and inspect all insurance policies and workmen's compensation certificates.

  13. 13. Provide planning, scheduling, expediting, technical coordination, and supervision, necessary for the proper execution of the work of all Trades. Perform any work with his own forces where circumstances demand.

  14. *Provide technical and financial administration with respect to progress payments, updating cash flow requirements and holdback releases.

  15. *Expedite the receipt of all shop drawings to ensure that they comply with the specified requirements in general terms before submitting them to the Architect for approval.

  16. *Evaluate and process all changes. Examine charges by the Trade Contractors to ensure that they are reasonable and in accordance with the contract documents.

  17. *Provide for and administer the necessary procedures to permit recovery of all tax rebates where applicable.

  18. Provide advice and assistance on labour problems in order to minimize work stoppages and in the settlement or jurisdictional or other labour disputes.

  19. Take the necessary action to facilitate the settlement of contract disputes, it being understood and agreed that no formal arbitration or litigation proceedings are to be undertaken without the permission of the Owner.

  20. *Ensure that "as built" drawings, maintenance manuals, operating instructions, etc., are properly completed and handed over to the Owner.

  21. Ensure that all Trade Contractors employed on the project rectify all deficiencies.
 
PART I
PART III